Unpublished conference/Abstract (Scientific congresses and symposiums)
Re-commissioning of a VAV air cistribution system.
Andre, Philippe; Aparecida Silva, Cl.; Fonseca, N. et al.
2004International conference for enhanced building operations (ICEBO'04)
 

Files


Full Text
CO39.pdf
Author preprint (333.72 kB)
Request a copy

All documents in ORBi are protected by a user license.

Send to



Details



Abstract :
[en] Three years after its start up, the building considered here is not yet providing a satisfactory comfort to its occupants. Too cold and too hot environmental conditions were too often encountered in different occupied zones, mainly in mid-season and in summertime. The execution of a re- commissioning process would support in resolving these problems. Previous verifications allowed us to confirm that almost all HVAC components considered are technically “correct” and that almost all problems are coming from mistakes committed when installing and tuning these components. The re-commissioning presented in this paper is based on both calculation and experimental data.
Disciplines :
Energy
Author, co-author :
Andre, Philippe ;  Université de Liège - ULiège > Département des sciences et gestion de l'environnement > Surveillance de l'environnement
Aparecida Silva, Cl.
Fonseca, N.
Hannay, J.
Lacôte, P.
Lebrun, Jean ;  Université de Liège - ULiège > Département d'aérospatiale et mécanique > Département d'aérospatiale et mécanique
Language :
English
Title :
Re-commissioning of a VAV air cistribution system.
Publication date :
October 2004
Event name :
International conference for enhanced building operations (ICEBO'04)
Event place :
Paris, France
Event date :
du 18 octobre 2004 au 19 octobre 2004
Audience :
International
Available on ORBi :
since 09 September 2009

Statistics


Number of views
49 (0 by ULiège)
Number of downloads
0 (0 by ULiège)

Bibliography


Similar publications



Contact ORBi