Reference : Production planning problems in printed circuit board assembly
Scientific journals : Article
Business & economic sciences : Production, distribution & supply chain management
http://hdl.handle.net/2268/1730
Production planning problems in printed circuit board assembly
English
Crama, Yves mailto [Université de Liège - ULg > HEC - Ecole de gestion de l'ULg > Recherche opérationnelle et gestion de la production >]
van de Klundert, Joris [> > > >]
Spieksma, Frits CR [> > > >]
15-Nov-2002
Discrete Applied Mathematics
Elsevier Science Bv
123
1-3
339-361
Yes (verified by ORBi)
International
0166-218X
Amsterdam
[en] production planning ; scheduling ; sequencing ; printed circuit boards ; integer programming models
[en] This survey describes some of the main optimization problems arising in the context of production planning for the assembly of printed circuit boards. The discussion is structured around a hierarchical decomposition of the planning process into distinct optimization subproblems, addressing issues such as the assignment of board types to machine groups, the allocation of component feeders to individual machines, the determination of optimal production sequences, etc, The paper reviews the literature on this topic with an emphasis on the most recent developments, on the fundamental structure of the mathematical models and on the relation between these models and some 'environmental' variables such as the layout of the shop or the product mix. (C) 2002 Elsevier Science B.V, All rights reserved.
Researchers ; Professionals
http://hdl.handle.net/2268/1730
10.1016/S0166-218X(01)00345-6
Available online at www.sciencedirect.com

File(s) associated to this reference

Fulltext file(s):

FileCommentaryVersionSizeAccess
Open access
SurveyPCB.pdfAuthor preprint485.02 kBView/Open

Bookmark and Share SFX Query

All documents in ORBi are protected by a user license.