Implementation of LEAN and BIM processes into an innovative Building Construction System.
Schmitz, Dimitri
2012Summer School of the international conference IGLC 2012
 

Files


Full Text
No document available.

Send to



Details



Keywords :
BIM; LEAN; Building Construction System
Abstract :
[en] The Building Construction System « Upbrella » proposes a new concept for the erection of high-rise buildings and offers a controlled and isolated work environment by integrating a protective mobile roof and wall during construction. Therefore lower floors could be occupied once their construction is completed, while other higher floors are still under construction.We aim to explore, using a design science approach, how the overall construction phase could be optimized the by integrating some of BIM and LEAN construction processes within the Upbrella system. A first six-story building will be erected from June 2012 in order to test the system. The building will be built in two phases (3 floors per phase). The first phase will consist of a traditional construction without the Upbrella system and the second phase will use the Upbrella system.
Disciplines :
Architecture
Author, co-author :
Schmitz, Dimitri ;  Université de Liège - ULiège > Département Argenco : Secteur A&U > Architecture
Language :
English
Title :
Implementation of LEAN and BIM processes into an innovative Building Construction System.
Publication date :
2012
Event name :
Summer School of the international conference IGLC 2012
Event place :
San Diego, United States
Event date :
18 juillet 2012 au 22 juillet 2012
Available on ORBi :
since 16 March 2014

Statistics


Number of views
141 (17 by ULiège)
Number of downloads
0 (0 by ULiège)

Bibliography


Similar publications



Contact ORBi