Poster (Scientific congresses and symposiums)
Design of a decision tool for hydromorphological restoration of water bodies in Walloon Region
Peeters, Alexandre; Hallot, Eric; Verniers, Gisèle et al.
2010EGU General Assembly
 

Files


Full Text
EGU_Poster_Peeters.pdf
Author postprint (355.81 kB)
Request a copy

All documents in ORBi are protected by a user license.

Send to



Details



Keywords :
Hydromorphological restoration; Geomorphological monitoring; Ecological monitoring
Abstract :
[en] The pilot project WALPHY (LIFE + Environment LIFE07 ENV/B/000038, UE-funded) develops a structured approach aiming at improving hydromorphological quality of the upstream Meuse basin in order to achieve the “good ecological status” required by the Water Framework Directive (WFD 2000/60). It began in January 2009 for a period of 5 years. River’s biological recovery needs the recovery of river’s structure and physical dynamics. Returning to "good ecological status" inevitably involves physical restoration of affected rivers. Physical component of aquatic environment acts as a limiting factor for their functioning. Three types of modification are key obstacles for river good ecological status: (i) fluxes alteration (discharge, sedimentation. . . ), (ii) forms alteration (uniform facies. . . ) and (iii) biotopes access alteration (lateral connections breaks, modification of the continuity upstream/ downstream. . . ). Therefore hydromorphology is needed to implement the WFD. To respond to this legal necessity, we develop a unique, useful and suitable methodology in Walloon Region to determine and schedule river physical quality restoration works. This methodology has been applied on 3 “risk water bodies”. The works are based on two axes : longitudinal continuity and transversal continuity. The two first selected water bodies (Bocq river, eastern tributary of the Meuse) seem to be convenient for the restoration works which concern the longitudinal continuity due to the presence of dams and other obstacles usually between 1 and 3 m high. These works consist in dam management (weir removal or fish passage) taking into account hydromorphological (bedload transport) and biological (invertebrate or fish species free movement) impacts. The third water bodies (Eau Blanche river, western tributary of the Meuse) presents straightened rivers with artificial banks, witch consequently own bad connections between the stream and its floodplain. This water bodies should therefore be appropriated for the works based on the transversal continuity recovery. They consist in enhancing straightened river channels, restoring meanders or bank restoration. The first river restoration works will take place from summer 2010. A monitoring has already been undertaken to draw up the situation before the restoration works, witch will be able to compare to the situations during and after works. In addition, a natural site has been chosen to enable any comparison with the intervention sites. The geomorphological monitoring is based on physical and sedimentological parameters (substrate cartography, velocity measures, stream channel DEM, topography and sedimentological index). The ecological monitoring consists in analysing the physical and chemical parameters (turbidity, suspended sediment load). It also analyses the biological quality through 3 indicators: macrophytes, macroinvertebrates and fishes. Among other, a microhabitats method has been improved and applied on 3 intervention sites and 1 natural site. The microhabitats cartography results from both the flow velocity cartography and the substrate cartography. With this method, the physical quality of each intervention site could be compared with the natural site and above all with the future situation. Our method is also useful to inventory precisely invertebrates and to characterise fish habitats.
Disciplines :
Earth sciences & physical geography
Environmental sciences & ecology
Author, co-author :
Peeters, Alexandre  ;  Université de Liège - ULiège > Département de géographie > Hydrographie et géomorphologie fluviatile
Hallot, Eric ;  Université de Liège - ULiège > Département de géographie > Hydrographie et géomorphologie fluviatile
Verniers, Gisèle;  Université de Namur > Biologie > Unité de Recherche en Biologie Environnementale et Evolutive
de le Court, Bernard;  Service public de Wallonie > Direction générale Agriculture, Ressources naturelles et Environnement > Direction des Cours d’Eau non navigables
Descy, Jean-Pierre ;  Université de Namur > Biologie > Unité de Recherche en Biologie Environnementale et Evolutive
Latli, Adrien;  Université de Namur > Biologie > Unité de Recherche en Biologie Environnementale et Evolutive
Lambot, Francis;  Service public de Wallonie > Direction générale Agriculture, Ressources naturelles et Environnement > Direction des Cours d’Eau non navigables
Petit, François  ;  Université de Liège - ULiège > Département de géographie > Hydrographie et géomorphologie fluviatile
Language :
English
Title :
Design of a decision tool for hydromorphological restoration of water bodies in Walloon Region
Publication date :
05 May 2010
Event name :
EGU General Assembly
Event organizer :
European Geosciences Union (EGU)
Event place :
Vienna, Austria
Event date :
du 2 au 7 mai 2010
Audience :
International
Name of the research project :
Walphy
Funders :
LIFE+ and SPW
Available on ORBi :
since 25 April 2013