| Reference : Advisory Board - new Lock in IJmuiden. |
| Reports : Expert report | |||
| Engineering, computing & technology : Civil engineering | |||
| http://hdl.handle.net/2268/117241 | |||
| Advisory Board - new Lock in IJmuiden. | |
| English | |
Rigo, Philippe [Université de Liège - ULg > Département ArGEnCo > Constructions hydrauliques et navales >] | |
| Sep-2011 | |
| Rijkwaterstaat | |
| 6 reports of 10-20 pages | |
| Amsterdam | |
| Netherlands | |
| [en] LOck ; lock design ; Sea lock | |
| [en] ‘The Advisory Board is to help the Directorate-General for Public Works and Water Management (RWS) and - via RWS - the contractor to draw up an optimal cost-effective detail for the lock design for the new Big Lock in IJmuiden. The Advisory Board is requested to assess the lock component variants proposed by the consultant engineers and to propose other variants for improving the design. The Advisory Board is requested to point out technical and nautical risks and to propose how risks can be quantified and managed. The Advisory Board is requested to describe the process used to select the preferred variant.’ | |
| RIJKWATERSTAAT, Port of AMsterdam | |
| lock design for the new Lock in IJmuiden. | |
| Rijkwaterstaat - Port of Amsterdam, Sea Access IJmond | |
| Professionals | |
| http://hdl.handle.net/2268/117241 |
There is no file associated with this reference.
All documents in ORBi are protected by a user license.