Reference : HARELBKE LOCK (Design & Build Procedure)
Reports : Expert report
Engineering, computing & technology : Civil engineering
http://hdl.handle.net/2268/117238
HARELBKE LOCK (Design & Build Procedure)
English
Rigo, Philippe mailto [Université de Liège - ULg > Département ArGEnCo > Constructions hydrauliques et navales >]
DEROUCK, Julien [ > > ]
Jan-2012
WaterWegen & Zeekanaal
26
1
Gand
Belgique
[en] Lock ; Design
[en] Three proposals have been received by the Waterwegen en Zeekanaal NV . This report reviews these proposals of lock design in the framework of HARELBKE LOCK (Design & Build Procedure)
ANAST, ULG
WaterWegen & ZeeKanaal
HARELBKE LOCK (Design & Build Procedure)
Professionals
http://hdl.handle.net/2268/117238

File(s) associated to this reference

Fulltext file(s):

FileCommentaryVersionSizeAccess
Private access
Report 1 - RIGO-DEROUCK, 10 Jan 2012 _V2_.pdfAuthor preprint1.03 MBRequest copy

Bookmark and Share SFX Query

All documents in ORBi are protected by a user license.