See detailImproving the Installation of Offshore Wind Farms by the use of Discrete Event Simulation
Muhabie, Yohannes Tekle ULg; Caprace, Jean-David ULg; Petcu, Cristian ULg et al

in Improving the Installation of Offshore Wind Farms by the use of Discrete Event Simulation (2015, November)

The offshore wind energy development is highly affected by the condition of the weather at sea. Hence, it demands a well-organized planning of the overall process starting from the producers’ sites until ... [more ▼]

The offshore wind energy development is highly affected by the condition of the weather at sea. Hence, it demands a well-organized planning of the overall process starting from the producers’ sites until the offshore site where the turbines will finally be installed. The planning phase can be supported with the help of Discrete Event Simulation (DES) where weather restrictions, distance matrix, vessel characteristics and assembly scenarios are taken into account. The purpose of this paper is to simulate the overall transport, assembly and installation of the wind turbine components at sea. The analysis is carried out through DES considering both the real historical weather data (wind speed and wave height) and probabilistic approach. Results of the study, applied to the real Offshore Wind Farm (OWF) configuration, are showing a good agreement between the two proposed models. The results point out that the probabilistic approach is highly affected by the semi-random numbers used to model the stochastic behavior of the input variable so that several iterations (200 to 400) are required to reach the convergence of the simulation outputs. We suggest that seasonality of the outputs of both models are preserved, i.e. the variation of the results depending on the variation of the weather along the year. These findings provide a new framework to address risks and uncertainties in OWF installations. [less ▲]

Detailed reference viewed: 69 (15 ULg)
Full Text
Peer Reviewed
See detailOptimization of Shipyard Space Allocation and Scheduling using Heuristic Algorithm
Caprace, Jean-David ULg; Petcu, Cristian ULg; Velarde, Marco et al

in Journal of Marine Science & Technology (2013), 18(3), 404-417

In this paper we describe the development of a tool that allows planners to efficiently and effectively plan space within valuable areas of a shipyard. Traditionally, space is considered as resource ... [more ▼]

In this paper we describe the development of a tool that allows planners to efficiently and effectively plan space within valuable areas of a shipyard. Traditionally, space is considered as resource; however, it is difficult to accurately account for and plan its consumption with the current planning software tools available. The spatial scheduling tool described in this paper can be used by planners to manually or automatically reserve space within the shipyard for construction of large blocks over the entire ship erection period. The software is coupled with a heuristic optimization solver which is inspired by an algorithm used for "3D bin-packing problems". The result is the ability to efficiently generate and compare multiple space allocation alternatives in a reduced time with the ultimate goal of maintaining the critical ship erection schedule. Better solution than manual or semi-automatic allocation of blocks can be obtained through the optimization module. [less ▲]

Detailed reference viewed: 84 (10 ULg)
Full Text
Peer Reviewed
See detailToward a Risk Based Simulation for the Erection of an Offshore Windmill Park
Caprace, Jean-David ULg; Petcu, Cristian ULg; Velarde, Marco et al

in Proceeding of the 11th International Conference on Computer Applications and Information Technology in the Maritime Industries (2012, April)

Nowadays, EU shipyards that are facing difficulties due to the global crisis are often trying to diversify their activities. Some of them have already turned to the production of offshore windmill ... [more ▼]

Nowadays, EU shipyards that are facing difficulties due to the global crisis are often trying to diversify their activities. Some of them have already turned to the production of offshore windmill components. The installation and operation of offshore windmills are much more complex than onshore due to the distance and the depth of the water column. This creates problems specific to the production, installation and maintenance of offshore wind turbines. A tool for sequencing and installation simulation has been developed to assess the risks associated to the assembly of wind turbines parks via simulations of the different phases of construction considering various random phenomena such as weather conditions and uncertainties on production time. [less ▲]